Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
315-C0002A		Drilling/drill rig	DRILL			33.30030	136.63630	-1936					1401.5 m drilled
315-C0002F		Drilling/drill rig	DRILL			33.30080	136.63670	-1939					2005.5 m drilled
315-C0002H		Drilling/drill rig	DRILL			33.30040	136.63690	-1936.5					1120 m drilled
315-C0002J		Drilling/drill rig	DRILL			33.30030	136.63720	-1937.5					940 m drilled
315-C0002K		Drilling/drill rig	DRILL			33.30010	136.63680	-1937.5					286.5 m drilled
315-C0002L		Drilling/drill rig	DRILL			33.30000	136.63700	-1937.5					505 m drilled
315-C0002M		Drilling/drill rig	DRILL			33.30010	136.63730	-1937.5					512.5 m drilled
315-C0002N		Drilling/drill rig	DRILL			33.30080	136.63670	-1939					2320.5 m drilled
315-C0002P		Drilling/drill rig	DRILL			33.30080	136.63670	-1939					2218.5 m drilled
315-C0001E		Drilling/drill rig	DRILL			33.23907	136.71154	-2198					13 HPCS cores; 118.1 m cored; 95.4 % recovered; 118.1 m drilled; Lost inner core barrel in hole
315-C0001F		Drilling/drill rig	DRILL			33.23906	136.71178	-2197					19 HPCS, 2 ESCS cores; 140.8 m cored; 97.7 % recovered; 248.83 m drilled;
315-C0001G		Drilling/drill rig	DRILL			33.23873	136.71156	-2196.5					0 cores; 0 m cored; 0 % recovered; 74.5 m drilled; ROV cable tangled around drill pipe
315-C0001H		Drilling/drill rig	DRILL			33.23872	136.71140	-2197					26 RCB cores; 228.6 m cored; 55.2 % recovered; 590.5 m drilled; Hole caving
315-C0001I		Drilling/drill rig	DRILL			33.23672	136.70722	-2198.5					0 cores; 0 m cored; 0 % recovered; 520 m drilled; Hole caving
315-C0002B		Drilling/drill rig	DRILL			33.29988	136.63672	-1937.5					66 RCB cores; 582 m cored; 35.8 % recovered; 1057 m drilled;
315-C0002C		Drilling/drill rig	DRILL			33.30004	136.63645	-1936.6					2 HPCS cores; 13.8 m cored; 99.8 % recovered; 13.77 m drilled;
315-C0002D		Drilling/drill rig	DRILL			33.30013	136.63652	-1937.1					16 HPCS, 2 ESCS cores; 204 m cored; 79.4 % recovered; 204 m drilled;