Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
317-U1351A		Drilling/drill rig	DRILL		2009-11-18T09:30:00	-44.88384	171.84006	-122.3	2009-11-18T23:30:00				6 cores; 28 m cored; 98 % recovered; 0 m drilled; 28 m penetrated
317-U1351B		Drilling/drill rig	DRILL		2009-11-18T23:30:00	-44.88403	171.84010	-121.7	2009-11-25T18:00:00				116 cores; 1030.6 m cored; 30 % recovered; 0 m drilled; 1030.6 m penetrated
317-U1351C		Drilling/drill rig	DRILL		2009-11-25T18:00:00	-44.88428	171.84009	-121.7	2009-11-30T02:00:00				NA cores; 0 m cored; NA % recovered; 967.3 m drilled; 967.3 m penetrated
317-U1352A		Drilling/drill rig	DRILL		2009-11-30T05:00:00	-44.93740	172.02269	-343.8	2009-11-30T15:30:00				5 cores; 42.2 m cored; 104 % recovered; 0 m drilled; 42.2 m penetrated
317-U1352B		Drilling/drill rig	DRILL		2009-11-30T15:30:00	-44.93759	172.02271	-343.6	2009-12-05T16:15:00				94 cores; 830.9 m cored; 74 % recovered; 0 m drilled; 830.9 m penetrated
317-U1352C		Drilling/drill rig	DRILL		2009-12-05T16:15:00	-44.93777	172.02271	-343.5	2009-12-20T22:00:00				148 cores; 1296.4 m cored; 51 % recovered; 631.1 m drilled; 1927.5 m penetrated
317-U1352D		Drilling/drill rig	DRILL		2009-12-20T22:00:00	-44.93721	172.02268	-344.2	2009-12-21T21:00:00				14 cores; 127 m cored; 103 % recovered; 0 m drilled; 127 m penetrated
317-U1353A		Drilling/drill rig	DRILL		2009-12-21T23:15:00	-44.76846	171.67394	-84.2	2009-12-22T11:15:00				8 cores; 56 m cored; 101 % recovered; 0 m drilled; 56 m penetrated
317-U1353B		Drilling/drill rig	DRILL		2009-12-22T11:15:00	-44.76867	171.67401	-84.7	2009-12-26T20:45:00				98 cores; 614.3 m cored; 34 % recovered; 0 m drilled; 614.3 m penetrated
317-U1353C		Drilling/drill rig	DRILL		2009-12-26T20:45:00	-44.76830	171.67396	-84.7	2009-12-28T21:00:00				NA cores; 0 m cored; NA % recovered; 529 m drilled; 529 m penetrated
317-U1354A		Drilling/drill rig	DRILL		2009-12-28T23:45:00	-44.84713	171.78682	-109.8	2009-12-29T23:00:00				19 cores; 85.4 m cored; 101 % recovered; 0 m drilled; 85.4 m penetrated
317-U1354B		Drilling/drill rig	DRILL		2009-12-29T23:00:00	-44.84727	171.78678	-113.4	2009-12-30T12:45:00				15 cores; 77.2 m cored; 100 % recovered; 0 m drilled; 77.2 m penetrated
317-U1354C		Drilling/drill rig	DRILL		2009-12-30T12:45:00	-44.84747	171.78680	-113.4	2010-02-01T12:00:00				36 cores; 319.2 m cored; 42 % recovered; 65 m drilled; 384.2 m penetrated
317-U1352		Composite Core	COMPCORE			-44.93700	172.02200						
