Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
116-717B		Drilling/drill rig	DRILL		1987-07-10T00:00:00	-0.92980	81.39010	-4746					2 cores; 13.5 m cored; 0 m drilled; 99.5 % recovery
116-717A		Drilling/drill rig	DRILL		1987-07-10T00:00:00	-0.92980	81.39010	-4747					1 core; 9.5 m cored; 0 m drilled; 101.5 % recovery
116-717C		Drilling/drill rig	DRILL		1987-07-10T00:00:00	-0.92980	81.39010	-4746					87 cores; 814.7 m cored; 0 m drilled; 59 % recovery
116-717		Composite Core	COMPCORE		1987-07-10T00:00:00	-0.92980	81.39010	-4746.3					90 cores; 837.7 m cored; 0 m drilled; 60.1% recovery
116-718E		Drilling/drill rig	DRILL		1987-07-20T00:00:00	-1.02090	81.40110	-4742					3 cores; 28.5 m cored; 0 m drilled; 34.8 % recovery
116-718D		Drilling/drill rig	DRILL		1987-07-20T00:00:00	-1.02090	81.40110	-4742					2 cores; 19 m cored; 0 m drilled; 0.9 % recovery
116-718A		Drilling/drill rig	DRILL		1987-07-20T00:00:00	-1.02090	81.40110	-4741					1 core; 9.5 m cored; 0 m drilled; 99.2 % recovery
116-718B		Drilling/drill rig	DRILL		1987-07-20T00:00:00	-1.02090	81.40110	-4741					1 core; 9.5 m cored; 0 m drilled; 97.5 % recovery
116-718C		Drilling/drill rig	DRILL		1987-07-20T00:00:00	-1.02090	81.40110	-4741					98 cores; 925.7 m cored; 0 m drilled; 29.6 % recovery
116-718		Composite Core	COMPCORE		1987-07-20T00:00:00	-1.02090	81.40110	-4741.4					105 cores; 992.2 m cored; 0 m drilled; 30.5% recovery
116-719A		Drilling/drill rig	DRILL		1987-08-02T00:00:00	-0.96080	81.39950	-4747					49 cores; 460.2 m cored; 0 m drilled; 40.3 % recovery
116-719		Composite Core	COMPCORE		1987-08-02T00:00:00	-0.96080	81.39950	-4747					49 cores; 460.2 m cored; 465.6 m drilled; 40.3% recovery
116-719B		Drilling/drill rig	DRILL		1987-08-02T00:00:00	-0.96080	81.39950	-4747					0 cores; 0 m cored; 465.6 m drilled
