Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
11-98		Drilling/drill rig	DRILL		1970-04-09T00:00:00	25.38250	-77.31130	-2769					15 cores; 122 m cored; 0 m drilled; 59.2 % recovery
11-98_Site		Composite Core	COMPCORE		1970-04-09T00:00:00	25.38250	-77.31130	-2769					15 cores; 122 m cored; 0 m drilled; 59.2% recovery
11-99A		Drilling/drill rig	DRILL		1970-04-13T00:00:00	23.68570	-73.84980	-4914					10 cores; 53 m cored; 26 m drilled; 53.8 % recovery
11-99_Site		Composite Core	COMPCORE		1970-04-13T00:00:00	23.68570	-73.84980	-4914					10 cores; 53 m cored; 26 m drilled; 53.8% recovery
11-99		Drilling/drill rig	DRILL		1970-04-13T00:00:00	23.68570	-73.84980	-4914					MECHANICAL OR EQUIP FAILURE
11-100		Drilling/drill rig	DRILL		1970-04-20T00:00:00	24.68780	-73.79970	-5325					13 cores; 93 m cored; 0 m drilled; 31.6 % recovery
11-100_Site		Composite Core	COMPCORE		1970-04-20T00:00:00	24.68780	-73.79970	-5325					13 cores; 93 m cored; 0 m drilled; 31.6% recovery
11-101A		Drilling/drill rig	DRILL		1970-04-24T00:00:00	25.19880	-74.43850	-4868					10 cores; 89 m cored; 0 m drilled; 26.4 % recovery
11-101		Drilling/drill rig	DRILL		1970-04-24T00:00:00	25.19880	-74.43850	-4868					2 cores; 18 m cored; 0 m drilled; 87.8 % recovery
11-101_Site		Composite Core	COMPCORE		1970-04-24T00:00:00	25.19880	-74.43850	-4868					12 cores; 107 m cored; 0 m drilled; 36.7% recovery
11-102		Drilling/drill rig	DRILL		1970-04-30T00:00:00	30.73220	-74.45230	-3426					19 cores; 109 m cored; 0 m drilled; 84.3 % recovery
11-102_Site		Composite Core	COMPCORE		1970-04-30T00:00:00	30.73220	-74.45230	-3426					19 cores; 109 m cored; 0 m drilled; 84.3% recovery
11-103_Site		Composite Core	COMPCORE		1970-05-05T00:00:00	30.45130	-74.58320	-3964					7 cores; 62 m cored; 0 m drilled; 63.2% recovery
11-103		Drilling/drill rig	DRILL		1970-05-05T00:00:00	30.45130	-74.58320	-3964					7 cores; 62 m cored; 0 m drilled; 63.2 % recovery
11-104_Site		Composite Core	COMPCORE		1970-05-07T00:00:00	30.82750	-74.32730	-3811					9 cores; 74 m cored; 9 m drilled; 75.8% recovery
11-104		Drilling/drill rig	DRILL		1970-05-07T00:00:00	30.82750	-74.32730	-3811					9 cores; 74 m cored; 9 m drilled; 75.8 % recovery
11-105_Site		Composite Core	COMPCORE		1970-05-13T00:00:00	34.89530	-69.17330	-5251					43 cores; 363 m cored; 0 m drilled; 54% recovery
11-105		Drilling/drill rig	DRILL		1970-05-13T00:00:00	34.89530	-69.17330	-5251					43 cores; 363 m cored; 0 m drilled; 54 % recovery
11-106A		Drilling/drill rig	DRILL		1970-05-20T00:00:00	36.43350	-69.46150	-4500					MECHANICAL OR EQUIP FAILURE
11-106		Drilling/drill rig	DRILL		1970-05-20T00:00:00	36.43350	-69.46150	-4500					5 cores; 39 m cored; 9 m drilled; 55.1 % recovery
11-106_Site		Composite Core	COMPCORE		1970-05-20T00:00:00	36.42740	-69.44585	-4500					12 cores; 85.5 m cored; 9 m drilled; 64.2% recovery
11-106B		Drilling/drill rig	DRILL		1970-05-20T00:00:00	36.42130	-69.43020	-4500					7 cores; 46.5 m cored; 0 m drilled; 71.8 % recovery
11-107_Site		Composite Core	COMPCORE		1970-05-28T00:00:00	38.65980	-72.47530	-2571					1 cores; 3 m cored; 9 m drilled; 50% recovery
11-107		Drilling/drill rig	DRILL		1970-05-28T00:00:00	38.65980	-72.47530	-2571					1 cores; 3 m cored; 9 m drilled; 50 % recovery
11-108_Site		Composite Core	COMPCORE		1970-05-29T00:00:00	38.80450	-72.65350	-1845					2 cores; 36 m cored; 134 m drilled; 20% recovery
11-108		Drilling/drill rig	DRILL		1970-05-29T00:00:00	38.80450	-72.65350	-1845					2 cores; 36 m cored; 134 m drilled; 20 % recovery
