Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
138-844		Composite Core	COMPCORE		1991-05-08T00:00:00	7.92132	-90.48077	-3414.5	1991-05-12T00:00:00				52 cores; 490 m cored; 0 m drilled; 101.9% recovery
138-844A		Drilling/drill rig	DRILL		1991-05-08T14:37:00	7.92131	-90.48076	-3414.5	1991-05-09T06:00:00				1 core; 9.5 m cored; 0 m drilled; 104.6 % recovery
138-844C		Drilling/drill rig	DRILL		1991-05-11T10:24:00	7.92131	-90.48076	-3414.5	1991-05-12T08:04:00				19 cores; 180.1 m cored; 0 m drilled; 105.1 % recovery
138-844D		Drilling/drill rig	DRILL		1991-05-12T08:04:00	7.92131	-90.48076	-3414.5	1991-05-12T16:22:00				1 core; 9.5 m cored; 0 m drilled; 106.5 % recovery
138-845		Composite Core	COMPCORE		1991-05-13T00:00:00	9.58258	-94.59003	-3704.2	1991-05-17T00:00:00				55 cores; 519.6 m cored; 0 m drilled; 99.4% recovery
138-845A		Drilling/drill rig	DRILL		1991-05-13T19:45:00	9.58250	-94.59080	-3704.2	1991-05-16T06:29:00				31 core; 291.6 m cored; 0 m drilled; 100.4 % recovery
138-845B		Drilling/drill rig	DRILL		1991-05-16T06:29:00	9.58218	-94.58960	-3704.2	1991-05-17T05:00:00				21 core; 199.5 m cored; 0 m drilled; 97.9 % recovery
138-845C		Drilling/drill rig	DRILL		1991-05-17T05:00:00	9.58308	-94.58971	-3704.2	1991-05-17T14:50:00				3 cores; 28.5 m cored; 0 m drilled; 100 % recovery
138-846		Composite Core	COMPCORE		1991-05-21T00:00:00	-3.09500	-90.81833	-3296	1991-05-26T00:00:00				92 cores; 865.5 m cored; 0 m drilled; 94.9 % recovery
138-846A		Drilling/drill rig	DRILL		1991-05-21T10:30:00	-3.09493	-90.81796	-3295.6	1991-05-21T17:00:00				1 core; 7.2 m cored; 0 m drilled; 100.3 % recovery
138-846B		Drilling/drill rig	DRILL		1991-05-21T17:00:00	-3.09493	-90.81796	-3295.8	1991-05-24T06:08:00				45 cores; 422.4 m cored; 0 m drilled; 88.4 % recovery
138-846C		Drilling/drill rig	DRILL		1991-05-24T06:08:00	-3.09660	-90.81810	-3295.8	1991-05-25T02:27:00				20 cores; 190 m cored; 0 m drilled; 101.6 % recovery
138-846D		Drilling/drill rig	DRILL		1991-05-25T02:27:00	-3.09670	-90.81790	-3295.8	1991-05-26T05:28:00				26 cores; 245.9 m cored; 0 m drilled; 100.8 % recovery
138-847		Composite Core	COMPCORE		1991-05-27T00:00:00	0.19312	-95.32017	-3334.5	1991-05-31T00:00:00				67 cores; 616.9 m cored; 0 m drilled; 99% recovery
138-847A		Drilling/drill rig	DRILL		1991-05-27T17:18:00	0.19321	-95.32045	-3334.3	1991-05-28T06:50:00				1 core; 9.5 m cored; 0 m drilled; 100.2 % recovery
138-847B		Drilling/drill rig	DRILL		1991-05-28T06:50:00	0.19321	-95.32045	-3334.3	1991-05-29T18:40:00				27 cores; 247 m cored; 0 m drilled; 98.1 % recovery
138-847C		Drilling/drill rig	DRILL		1991-05-29T18:40:00	0.19308	-95.31981	-3334.3	1991-05-30T15:50:00				25 cores; 230.3 m cored; 0 m drilled; 98 % recovery
138-847D		Drilling/drill rig	DRILL		1991-05-30T13:50:00	0.19295	-95.31991	-3335.2	1991-05-31T05:25:00				14 cores; 130.1 m cored; 0 m drilled; 102.7 % recovery
138-848		Composite Core	COMPCORE		1991-06-04T00:00:00	-2.99408	-110.47998	-3854.7	1991-06-06T00:00:00				34 cores; 291.3 m cored; 0 m drilled; 103.6% recovery
138-848A		Drilling/drill rig	DRILL		1991-06-04T07:20:00	-2.99390	-110.47985	-3853.4	1991-06-04T15:35:00				1 core; 9.4 m cored; 0 m drilled; 101.5 % recovery
138-848B		Drilling/drill rig	DRILL		1991-06-04T15:35:00	-2.99390	-110.47985	-3855.6	1991-06-05T11:41:00				12 cores; 93.8 m cored; 0 m drilled; 104.2 % recovery
138-848C		Drilling/drill rig	DRILL		1991-06-05T11:41:00	-2.99418	-110.48008	-3855.3	1991-06-06T01:40:00				11 core; 94.2 m cored; 0 m drilled; 103.8 % recovery
138-848D		Drilling/drill rig	DRILL		1991-06-06T01:40:00	-2.99433	-110.48013	-3854.4	1991-06-06T15:26:00				10 cores; 93.9 m cored; 0 m drilled; 103.2 % recovery
138-849A		Drilling/drill rig	DRILL		1991-06-07T15:49:00	0.18305	-110.51971	-3837.1	1991-06-07T23:25:00				1 core; 8.7 m cored; 0 m drilled; 99.9 % recovery
138-849B		Drilling/drill rig	DRILL		1991-06-07T23:25:00	0.18305	-110.51971	-3839.1	1991-06-10T12:04:00				37 cores; 350.5 m cored; 0 m drilled; 98.1 % recovery
138-849C		Drilling/drill rig	DRILL		1991-06-10T12:04:00	0.18318	-110.51961	-3839.1	1991-06-11T14:10:00				11 core; 104.5 m cored; 0 m drilled; 101.1 % recovery
138-849D		Drilling/drill rig	DRILL		1991-06-11T14:10:00	0.18321	-110.51945	-3839.1	1991-06-12T09:30:00				34 cores; 322.7 m cored; 0 m drilled; 99 % recovery
138-850		Composite Core	COMPCORE		1991-06-12T00:00:00	1.29720	-110.52140	-3786.1	1991-06-16T00:00:00				50 cores; 471 m cored; 0 m drilled; 99.9% recovery
138-850A		Drilling/drill rig	DRILL		1991-06-12T21:48:00	1.29728	-110.52138	-3786.1	1991-06-13T12:44:00				8 cores; 74.2 m cored; 0 m drilled; 103.9 % recovery
138-850B		Drilling/drill rig	DRILL		1991-06-13T12:44:00	1.29711	-110.52143	-3786.1	1991-06-16T12:04:00				42 cores; 396.8 m cored; 0 m drilled; 99.2 % recovery
138-851		Composite Core	COMPCORE		1991-06-16T00:00:00	2.77028	-110.57163	-3760.3	1991-06-21T00:00:00				86 cores; 797.4 m cored; 0 m drilled; 100.1% recovery
138-851A		Drilling/drill rig	DRILL		1991-06-16T14:00:00	2.77038	-110.57180	-3761.3	1991-06-16T21:50:00				1 core; 6.5 m cored; 0 m drilled; 99.2 % recovery
138-851B		Drilling/drill rig	DRILL		1991-06-16T21:50:00	2.77038	-110.57180	-3760.3	1991-06-19T01:54:00				34 cores; 320.5 m cored; 0 m drilled; 99.2 % recovery
138-851C		Drilling/drill rig	DRILL		1991-06-19T01:54:00	2.77023	-110.57156	-3760.3	1991-06-19T16:44:00				14 cores; 133 m cored; 0 m drilled; 102.7 % recovery
138-851D		Drilling/drill rig	DRILL		1991-06-19T16:44:00	2.77023	-110.57156	-3759.3	1991-06-19T18:42:00				2 cores; 19 m cored; 0 m drilled; 105.8 % recovery
138-851E		Drilling/drill rig	DRILL		1991-06-19T18:42:00	2.77021	-110.57148	-3760.3	1991-06-21T05:55:00				35 cores; 318.4 m cored; 0 m drilled; 99.5 % recovery
138-852		Composite Core	COMPCORE		1991-06-22T00:00:00	5.29263	-110.07607	-3860.1	1991-06-24T00:00:00				39 cores; 350.5 m cored; 0 m drilled; 106% recovery
138-852A		Drilling/drill rig	DRILL		1991-06-22T01:35:00	5.29276	-110.07631	-3861	1991-06-22T10:05:00				1 core; 5.8 m cored; 0 m drilled; 101 % recovery
138-852B		Drilling/drill rig	DRILL		1991-06-22T10:05:00	5.29276	-110.07631	-3859.9	1991-06-23T00:40:00				13 cores; 113.4 m cored; 0 m drilled; 105.5 % recovery
138-852C		Drilling/drill rig	DRILL		1991-06-23T00:40:00	5.29251	-110.07603	-3859.8	1991-06-23T14:45:00				13 cores; 117.3 m cored; 0 m drilled; 107.1 % recovery
138-852D		Drilling/drill rig	DRILL		1991-06-23T14:45:00	5.29250	-110.07561	-3859.8	1991-06-24T10:05:00				12 cores; 114 m cored; 0 m drilled; 105.8 % recovery
138-853		Composite Core	COMPCORE		1991-06-25T00:00:00	7.21092	-109.75130	-3714.1	1991-06-26T00:00:00				27 cores; 233.9 m cored; 0 m drilled; 104.6% recovery
138-853A		Drilling/drill rig	DRILL		1991-06-25T03:19:00	7.21101	-109.75140	-3714.3	1991-06-25T11:30:00				1 core; 9.5 m cored; 0 m drilled; 106.8 % recovery
138-853B		Drilling/drill rig	DRILL		1991-06-25T11:35:00	7.21101	-109.75140	-3715.5	1991-06-25T21:25:00				9 cores; 72.4 m cored; 0 m drilled; 107.3 % recovery
138-853C		Drilling/drill rig	DRILL		1991-06-25T21:25:00	7.21083	-109.75130	-3714.8	1991-06-26T06:10:00				8 cores; 68.2 m cored; 0 m drilled; 102 % recovery
138-853D		Drilling/drill rig	DRILL		1991-06-26T06:10:00	7.21085	-109.75123	-3712.5	1991-06-26T13:30:00				7 cores; 65.8 m cored; 0 m drilled; 104.6 % recovery
138-853E		Drilling/drill rig	DRILL		1991-06-26T13:30:00	7.21085	-109.75123	-3713.5	1991-06-26T15:35:00				2 cores; 18 m cored; 0 m drilled; 102.8 % recovery
138-854		Composite Core	COMPCORE		1991-06-28T00:00:00	11.22387	-109.59418	-3567.8	1991-06-28T00:00:00				14 cores; 120.1 m cored; 0 m drilled; 102.4% recovery
138-854A		Drilling/drill rig	DRILL		1991-06-28T04:23:00	11.22388	-109.59420	-3567.9	1991-06-28T07:55:00				3 cores; 28.7 m cored; 0 m drilled; 72.8 % recovery
138-854B		Drilling/drill rig	DRILL		1991-06-28T07:55:00	11.22388	-109.59420	-3567.4	1991-06-28T12:41:00				5 cores; 45.4 m cored; 0 m drilled; 105.7 % recovery
138-854C		Drilling/drill rig	DRILL		1991-06-28T12:41:00	11.22385	-109.59415	-3568.2	1991-06-28T19:35:00				6 cores; 46 m cored; 0 m drilled; 117.5 % recovery
138-844B		Drilling/drill rig	DRILL		1991-08-09T06:00:00	7.92131	-90.48076	-3414.5	1991-05-11T10:24:00				31 core; 290.9 m cored; 0 m drilled; 99.7 % recovery
138-849		Composite Core	COMPCORE		1991-09-07T00:00:00	0.18333	-110.51833	-3839	1991-06-12T00:00:00				83 cores; 786.4 m cored; 0 m drilled; 98.9 % recovery
