Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
13-120		Drilling/drill rig	DRILL		1970-08-14T00:00:00	36.68980	-11.43230	-1711					8 cores; 27.6 m cored; 0 m drilled; 19.6 % recovery
13-120_Site		Composite Core	COMPCORE		1970-08-14T00:00:00	36.68980	-11.43230	-1711					8 cores; 27.6 m cored; 0 m drilled; 19.6% recovery
13-121		Drilling/drill rig	DRILL		1970-08-18T00:00:00	36.16080	-4.37380	-1163					24 cores; 190.7 m cored; 4 m drilled; 23.6 % recovery
13-121_Site		Composite Core	COMPCORE		1970-08-18T00:00:00	36.16080	-4.37380	-1163					24 cores; 190.7 m cored; 4 m drilled; 23.6% recovery
13-122		Drilling/drill rig	DRILL		1970-08-23T00:00:00	40.44780	2.62430	-2146					7 cores; 32.1 m cored; 0 m drilled; 19.9 % recovery
13-122_Site		Composite Core	COMPCORE		1970-08-23T00:00:00	40.44780	2.62430	-2146					7 cores; 32.1 m cored; 0 m drilled; 19.9% recovery
13-123_Site		Composite Core	COMPCORE		1970-08-24T00:00:00	40.63050	2.83780	-2290					7 cores; 62.2 m cored; 9.2 m drilled; 25.7% recovery
13-123		Drilling/drill rig	DRILL		1970-08-24T00:00:00	40.63050	2.83780	-2290					7 cores; 62.2 m cored; 9.2 m drilled; 25.7 % recovery
13-124_Site		Composite Core	COMPCORE		1970-08-26T00:00:00	38.87300	4.99480	-2726					13 cores; 68.2 m cored; 4.2 m drilled; 57.2% recovery
13-124		Drilling/drill rig	DRILL		1970-08-26T00:00:00	38.87300	4.99480	-2726					13 cores; 68.2 m cored; 4.2 m drilled; 57.2 % recovery
13-125		Drilling/drill rig	DRILL		1970-09-01T00:00:00	34.62480	20.42930	-2782					8 cores; 71 m cored; 25.9 m drilled; 64.3 % recovery
13-125A		Drilling/drill rig	DRILL		1970-09-01T00:00:00	34.62480	20.42930	-2782					9 cores; 72 m cored; 10 m drilled; 22.8 % recovery
13-125_Site		Composite Core	COMPCORE		1970-09-01T00:00:00	34.62480	20.42930	-2782					17 cores; 143 m cored; 35.9 m drilled; 43.4% recovery
13-126A		Drilling/drill rig	DRILL		1970-09-04T00:00:00	35.16200	21.42720	-3733					1 cores; 0.9 m cored; 0 m drilled; 66.7 % recovery
13-126		Drilling/drill rig	DRILL		1970-09-04T00:00:00	35.16200	21.42720	-3730					5 cores; 27.4 m cored; 3 m drilled; 65.3 % recovery
13-126_Site		Composite Core	COMPCORE		1970-09-04T00:00:00	35.16200	21.42720	-3731.5					6 cores; 28.3 m cored; 3 m drilled; 65.4% recovery
13-127_Site		Composite Core	COMPCORE		1970-09-06T00:00:00	35.73170	22.49680	-4643.3					25 cores; 176 m cored; 37 m drilled; 64.4% recovery
13-127A		Drilling/drill rig	DRILL		1970-09-06T00:00:00	35.73170	22.49680	-4636					5 cores; 31 m cored; 0 m drilled; 71.9 % recovery
13-127		Drilling/drill rig	DRILL		1970-09-06T00:00:00	35.73170	22.49680	-4654					19 cores; 144 m cored; 37 m drilled; 63 % recovery
13-127B		Drilling/drill rig	DRILL		1970-09-06T00:00:00	35.73170	22.49680	-4640					1 cores; 1 m cored; 0 m drilled; 40 % recovery
13-128		Drilling/drill rig	DRILL		1970-09-10T00:00:00	35.70970	22.46830	-4640					11 cores; 94.5 m cored; 101 m drilled; 73.7 % recovery
13-128_Site		Composite Core	COMPCORE		1970-09-10T00:00:00	35.70970	22.46830	-4640					11 cores; 94.5 m cored; 101 m drilled; 73.7% recovery
13-129_Site		Composite Core	COMPCORE		1970-09-13T00:00:00	34.34930	27.08200	-2974					10 cores; 36 m cored; 69 m drilled; 16.1% recovery
13-129		Drilling/drill rig	DRILL		1970-09-13T00:00:00	34.34930	27.08200	-3048					4 cores; 14 m cored; 60 m drilled; 20.7 % recovery
13-129A		Drilling/drill rig	DRILL		1970-09-13T00:00:00	34.34930	27.08200	-2832					2 cores; 5 m cored; 9 m drilled; 32 % recovery
13-129B		Drilling/drill rig	DRILL		1970-09-13T00:00:00	34.34930	27.08200	-3042					4 cores; 17 m cored; 0 m drilled; 7.6 % recovery
13-130		Drilling/drill rig	DRILL		1970-09-16T00:00:00	33.60520	27.86650	-2979					8 cores; 191 m cored; 0 m drilled; 11.9 % recovery
13-130A		Drilling/drill rig	DRILL		1970-09-16T00:00:00	33.60520	27.86650	-2982					1 cores; 11 m cored; 0 m drilled; 13.6 % recovery
13-130_Site		Composite Core	COMPCORE		1970-09-16T00:00:00	33.60520	27.86650	-2980.5					9 cores; 202 m cored; 0 m drilled; 12% recovery
13-131		Drilling/drill rig	DRILL		1970-09-18T00:00:00	33.10650	28.51150	-3035					1 cores; 9 m cored; 0 m drilled; 88.9 % recovery
13-131_Site		Composite Core	COMPCORE		1970-09-18T00:00:00	33.10650	28.51150	-3036					6 cores; 54 m cored; 0 m drilled; 29.3% recovery
13-131A		Drilling/drill rig	DRILL		1970-09-18T00:00:00	33.10650	28.51150	-3037					5 cores; 45 m cored; 0 m drilled; 17.3 % recovery
13-132		Drilling/drill rig	DRILL		1970-09-24T00:00:00	40.26170	11.44120	-2835					26 cores; 214 m cored; 9 m drilled; 77.2 % recovery
13-132_Site		Composite Core	COMPCORE		1970-09-24T00:00:00	40.26170	11.44120	-2835					26 cores; 214 m cored; 9 m drilled; 77.2% recovery
13-133		Drilling/drill rig	DRILL		1970-09-27T00:00:00	39.19980	7.33550	-2563					7 cores; 59 m cored; 9 m drilled; 11 % recovery
13-133_Site		Composite Core	COMPCORE		1970-09-27T00:00:00	39.19980	7.33550	-2563					7 cores; 59 m cored; 9 m drilled; 11% recovery
13-134_Site		Composite Core	COMPCORE		1970-09-28T00:00:00	39.19500	7.30420	-2867					14 cores; 82 m cored; 37 m drilled; 31.7% recovery
13-134E		Drilling/drill rig	DRILL		1970-09-28T00:00:00	39.19500	7.30420	-2869					2 cores; 12 m cored; 4 m drilled; 2.5 % recovery
13-134C		Drilling/drill rig	DRILL		1970-09-28T00:00:00	39.19500	7.30420	-2869					OPERATIONAL LIMIT REACHED
13-134B		Drilling/drill rig	DRILL		1970-09-28T00:00:00	39.19500	7.30420	-2869					1 cores; 5 m cored; 0 m drilled; 4 % recovery
13-134A		Drilling/drill rig	DRILL		1970-09-28T00:00:00	39.19500	7.30420	-2863					2 cores; 11 m cored; 0 m drilled; 17.3 % recovery
13-134		Drilling/drill rig	DRILL		1970-09-28T00:00:00	39.19500	7.30420	-2863					6 cores; 39 m cored; 33 m drilled; 57.2 % recovery
13-134D		Drilling/drill rig	DRILL		1970-09-28T00:00:00	39.19500	7.30420	-2871					3 cores; 15 m cored; 0 m drilled; 8.7 % recovery
