Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
14-135_Site		Composite Core	COMPCORE		1970-10-10T00:00:00	35.34670	-10.42430	-4152					9 cores; 57 m cored; 0 m drilled; 46% recovery
14-135		Drilling/drill rig	DRILL		1970-10-10T00:00:00	35.34670	-10.42430	-4152					9 cores; 57 m cored; 0 m drilled; 46 % recovery
14-136		Drilling/drill rig	DRILL		1970-10-15T00:00:00	34.16880	-16.30320	-4169					9 cores; 203 m cored; 0 m drilled; 17.8 % recovery
14-136_Site		Composite Core	COMPCORE		1970-10-15T00:00:00	34.16880	-16.30320	-4169					9 cores; 203 m cored; 0 m drilled; 17.8% recovery
14-137		Drilling/drill rig	DRILL		1970-10-20T00:00:00	25.92550	-27.06070	-5361					16 cores; 127 m cored; 9 m drilled; 54.4 % recovery
14-137_Site		Composite Core	COMPCORE		1970-10-20T00:00:00	25.92550	-27.06070	-5361					16 cores; 127 m cored; 9 m drilled; 54.4% recovery
14-138		Drilling/drill rig	DRILL		1970-10-24T00:00:00	25.92280	-25.56320	-5288					7 cores; 54 m cored; 0 m drilled; 49.8 % recovery
14-138_Site		Composite Core	COMPCORE		1970-10-24T00:00:00	25.92280	-25.56320	-5288					7 cores; 54 m cored; 0 m drilled; 49.8% recovery
14-139_Site		Composite Core	COMPCORE		1970-10-29T00:00:00	23.51900	-18.70430	-3047					5 cores; 38 m cored; 17 m drilled; 51.8% recovery
14-139		Drilling/drill rig	DRILL		1970-10-29T00:00:00	23.51900	-18.70430	-3047					5 cores; 38 m cored; 17 m drilled; 51.8 % recovery
14-140_Site		Composite Core	COMPCORE		1970-10-31T00:00:00	21.74950	-21.79200	-4483					9 cores; 66 m cored; 5 m drilled; 61.2% recovery
14-140		Drilling/drill rig	DRILL		1970-10-31T00:00:00	21.74950	-21.79200	-4483					7 cores; 48 m cored; 5 m drilled; 64 % recovery
14-140A		Drilling/drill rig	DRILL		1970-10-31T00:00:00	21.74950	-21.79200	-4483					2 cores; 18 m cored; 0 m drilled; 53.9 % recovery
14-141_Site		Composite Core	COMPCORE		1970-11-05T00:00:00	19.41930	-23.99850	-4148					10 cores; 81 m cored; 0 m drilled; 89.3% recovery
14-141		Drilling/drill rig	DRILL		1970-11-05T00:00:00	19.41930	-23.99850	-4148					10 cores; 81 m cored; 0 m drilled; 89.3 % recovery
14-142		Drilling/drill rig	DRILL		1970-11-13T00:00:00	3.36920	-42.39150	-4372					10 cores; 78 m cored; 0 m drilled; 54.9 % recovery
14-142_Site		Composite Core	COMPCORE		1970-11-13T00:00:00	3.36920	-42.39150	-4372					10 cores; 78 m cored; 0 m drilled; 54.9% recovery
14-143D		Drilling/drill rig	DRILL		1970-11-19T00:00:00	9.47420	-54.31180	-3501					
14-143		Drilling/drill rig	DRILL		1970-11-19T00:00:00	9.47420	-54.31180	-3493					MECHANICAL OR EQUIP FAILURE
14-143A		Drilling/drill rig	DRILL		1970-11-19T00:00:00	9.47420	-54.31180	-3493					
14-143B		Drilling/drill rig	DRILL		1970-11-19T00:00:00	9.47420	-54.31180	-3493					
14-143C		Drilling/drill rig	DRILL		1970-11-19T00:00:00	9.47420	-54.31180	-3501					
14-144B		Drilling/drill rig	DRILL		1970-11-23T00:00:00	9.45380	-54.34200	-2957					3 cores; 27 m cored; 0 m drilled; 99.6 % recovery
14-144A		Drilling/drill rig	DRILL		1970-11-23T00:00:00	9.45380	-54.34200	-2957					6 cores; 53 m cored; 0 m drilled; 57.4 % recovery
14-144		Drilling/drill rig	DRILL		1970-11-23T00:00:00	9.45380	-54.34200	-2957					8 cores; 40 m cored; 0 m drilled; 70 % recovery
14-144_Site		Composite Core	COMPCORE		1970-11-23T00:00:00	9.45380	-54.34200	-2957					17 cores; 120 m cored; 0 m drilled; 71.1% recovery
