Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
185-801D		Drilling/drill rig	DRILL		1999-04-28T10:00:00	18.64230	156.36080	-5673.6	1999-04-29T08:30:00				0 cores; 0 m cored; 0 m drilled
185-801		Composite Core	COMPCORE		1999-04-29T00:00:00	18.64230	156.36028	-5673.8	1998-04-29T00:00:00				40 cores; 339.3 m cored; 2.1 m drilled; 47.2% recovery
185-801C		Drilling/drill rig	DRILL		1999-04-29T08:30:00	18.64230	156.35980	-5674	1999-05-19T13:30:00				40 cores; 339.3 m cored; 2.1 m drilled; 47.2 % recovery
185-1149		Composite Core	COMPCORE		1999-05-23T00:00:00	31.33498	143.36342	-5830	1999-06-13T00:00:00				80 cores; 720.9 m cored; 151.1 m drilled; 33.6% recovery
185-1149A		Drilling/drill rig	DRILL		1999-05-23T15:00:00	31.34200	143.35130	-5817.6	1999-05-26T07:25:00				23 cores; 191.2 m cored; 0 m drilled; 91.2 % recovery
185-1149B		Drilling/drill rig	DRILL		1999-05-26T07:25:00	31.34220	143.35100	-5817.5	1999-06-02T20:00:00				31 core; 284.6 m cored; 151.1 m drilled; 11.6 % recovery
185-1149C		Drilling/drill rig	DRILL		1999-06-02T20:00:00	31.34250	143.35100	-5817.6	1999-06-07T03:00:00				8 cores; 76.9 m cored; 0 m drilled; 8.3 % recovery
185-1149D		Drilling/drill rig	DRILL		1999-06-07T05:15:00	31.31320	143.40040	-5867.3	1999-06-13T16:15:00				18 cores; 168.2 m cored; 0 m drilled; 17.1 % recovery
