Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
202-1232		Composite Core	COMPCORE		2002-04-07T00:00:00	-39.89090	-75.90135	-4072.3					53 cores; 494.6 m cored; 0 m drilled; 84.3 % recovery
202-1232A		Drilling/drill rig	DRILL		2002-04-07T11:00:00	-39.89116	-75.90136	-4078.6	2002-04-10T16:25:00				39 cores; 371.3 m cored; 0 m drilled; 77.8 % recovery
202-1232B		Drilling/drill rig	DRILL		2002-04-10T16:25:00	-39.89088	-75.90131	-4069.5	2002-04-11T08:15:00				10 cores; 90.1 m cored; 0 m drilled; 106.9 % recovery
202-1232C		Drilling/drill rig	DRILL		2002-04-11T08:15:00	-39.89066	-75.90136	-4068.9					4 cores; 33.2 m cored; 0 m drilled; 95.4 % recovery
202-1233		Composite Core	COMPCORE		2002-04-12T00:00:00	-41.00008	-74.44986	-838					cores; 411 m cored; 40.6 m drilled; 102.7 % recovery
202-1233A		Drilling/drill rig	DRILL		2002-04-12T09:45:00	-41.00001	-74.44996	-837.5	2002-04-12T13:45:00				1 core; 9.5 m cored; 2.5 m drilled; 104.6 % recovery
202-1233B		Drilling/drill rig	DRILL		2002-04-12T13:45:00	-41.00001	-74.44996	-837.5	2002-04-12T22:00:00				11 core; 100 m cored; 9.5 m drilled; 102 % recovery
202-1233C		Drilling/drill rig	DRILL		2002-04-12T22:00:00	-41.00005	-74.44986	-837.7	2002-04-13T07:45:00				13 cores; 116.3 m cored; 0 m drilled; 104.7 % recovery
202-1233D		Drilling/drill rig	DRILL		2002-04-13T07:45:00	-41.00015	-74.44985	-839.2	2002-04-13T17:15:00				13 cores; 110.3 m cored; 2 m drilled; 104.2 % recovery
202-1233E		Drilling/drill rig	DRILL		2002-04-13T17:15:00	-41.00021	-74.44970	-838.1					8 cores; 74.9 m cored; 26.6 m drilled; 98.3 % recovery
202-1234		Composite Core	COMPCORE		2002-04-15T00:00:00	-36.21922	-73.68170	-1014.7					49 cores; 461.6 m cored; 5.1 m drilled; 94.3 % recovery
202-1234A		Drilling/drill rig	DRILL		2002-04-15T06:50:00	-36.21921	-73.68181	-1015.6	2002-04-16T01:45:00				22 cores; 205.2 m cored; 0 m drilled; 92.1 % recovery
202-1234B		Drilling/drill rig	DRILL		2002-04-16T01:45:00	-36.21916	-73.68171	-1014	2002-04-16T15:15:00				19 cores; 180.4 m cored; 2 m drilled; 94.1 % recovery
202-1234C		Drilling/drill rig	DRILL		2002-04-16T15:15:00	-36.21926	-73.68156	-1014.4					8 cores; 76 m cored; 3.1 m drilled; 100.6 % recovery
202-1235		Composite Core	COMPCORE		2002-04-17T00:00:00	-36.15990	-73.56638	-488.9					55 cores; 509.5 m cored; 0.5 m drilled; 100.8 % recovery
202-1235A		Drilling/drill rig	DRILL		2002-04-17T04:15:00	-36.15985	-73.56650	-489.7	2002-04-17T19:55:00				20 cores; 181.3 m cored; 0 m drilled; 100.8 % recovery
202-1235B		Drilling/drill rig	DRILL		2002-04-17T19:55:00	-36.15986	-73.56638	-488.5	2002-04-18T10:00:00				19 cores; 176.2 m cored; 0 m drilled; 101.5 % recovery
202-1235C		Drilling/drill rig	DRILL		2002-04-18T10:00:00	-36.15998	-73.56626	-488.5					16 cores; 152 m cored; 0.5 m drilled; 99.9 % recovery
202-1236		Composite Core	COMPCORE		2002-04-22T00:00:00	-21.35898	-81.43608	-1322.9					55 cores; 495 m cored; 2.8 m drilled; 99 % recovery
202-1236A		Drilling/drill rig	DRILL		2002-04-22T13:45:00	-21.35898	-81.43600	-1323.7	2002-04-23T13:40:00				24 cores; 207.7 m cored; 0 m drilled; 95 % recovery
202-1236B		Drilling/drill rig	DRILL		2002-04-23T13:40:00	-21.35901	-81.43608	-1322.5	2002-04-24T08:45:00				13 cores; 122.8 m cored; 0 m drilled; 101.9 % recovery
202-1236C		Drilling/drill rig	DRILL		2002-04-24T08:45:00	-21.35896	-81.43616	-1322.5					18 cores; 164.5 m cored; 2.8 m drilled; 102 % recovery
202-1237		Composite Core	COMPCORE		2002-04-26T00:00:00	-16.00702	-76.37808	-3212.3					79 cores; 744.7 m cored; 151.5 m drilled; 103.5 % recovery
202-1237A		Drilling/drill rig	DRILL		2002-04-26T20:20:00	-16.00700	-76.37800	-3212.7	2002-04-27T03:55:00				1 core; 9.5 m cored; 1 m drilled; 104.7 % recovery
202-1237B		Drilling/drill rig	DRILL		2002-04-27T03:55:00	-16.00701	-76.37800	-3212.7	2002-04-29T07:24:00				34 cores; 317.4 m cored; 0 m drilled; 104.4 % recovery
202-1237C		Drilling/drill rig	DRILL		2002-04-29T07:24:00	-16.00703	-76.37808	-3211.9	2002-05-01T03:25:00				33 cores; 313.3 m cored; 2 m drilled; 103.3 % recovery
202-1237D		Drilling/drill rig	DRILL		2002-05-01T03:25:00	-16.00701	-76.37821	-3211.9					11 core; 104.5 m cored; 148.5 m drilled; 101.5 % recovery
202-1238		Composite Core	COMPCORE		2002-05-05T20:00:00	-1.87183	-82.78223	-2202.5					85 cores; 791.1 m cored; 8 m drilled; 99.5 % recovery
202-1238A		Drilling/drill rig	DRILL		2002-05-05T20:00:00	-1.87183	-82.78233	-2202.2	2002-05-08T19:40:00				46 cores; 430.6 m cored; 0 m drilled; 95.2 % recovery
202-1238B		Drilling/drill rig	DRILL		2002-05-08T19:40:00	-1.87183	-82.78223	-2202.2	2002-05-09T16:05:00				21 core; 198 m cored; 3 m drilled; 105.8 % recovery
202-1238C		Drilling/drill rig	DRILL		2002-05-09T16:05:00	-1.87183	-82.78213	-2203.2					18 cores; 162.5 m cored; 5 m drilled; 103.3 % recovery
202-1239		Composite Core	COMPCORE		2002-05-10T00:00:00	-0.67200	-82.08100	-1413.8					109 cores; 1026.1 m cored; 5.3 m drilled; 101.6 % recovery
202-1239A		Drilling/drill rig	DRILL		2002-05-10T19:45:00	-0.67200	-82.08083	-1414.7	2002-05-13T09:10:00				55 cores; 515.4 m cored; 0 m drilled; 99.9 % recovery
202-1239B		Drilling/drill rig	DRILL		2002-05-13T09:10:00	-0.67201	-82.08100	-1413.3	2002-05-14T14:15:00				42 cores; 396.7 m cored; 2 m drilled; 102.7 % recovery
202-1239C		Drilling/drill rig	DRILL		2002-05-14T14:15:00	-0.67200	-82.08116	-1413.3					12 cores; 114 m cored; 3.3 m drilled; 105 % recovery
202-1240		Composite Core	COMPCORE		2002-05-16T00:00:00	0.02185	-86.46263	-2920.8					65 cores; 603.7 m cored; 9.4 m drilled; 103.1 % recovery
202-1240A		Drilling/drill rig	DRILL		2002-05-16T01:00:00	0.02185	-86.46250	-2922.4	2002-05-17T11:45:00				28 cores; 253 m cored; 0 m drilled; 104.4 % recovery
202-1240B		Drilling/drill rig	DRILL		2002-05-17T11:45:00	0.02185	-86.46260	-2920	2002-05-18T14:00:00				26 cores; 246.2 m cored; 2 m drilled; 103.5 % recovery
202-1240C		Drilling/drill rig	DRILL		2002-05-18T14:00:00	0.02185	-86.46266	-2920.2	2002-05-18T23:40:00				8 cores; 76 m cored; 4.2 m drilled; 99.1 % recovery
202-1240D		Drilling/drill rig	DRILL		2002-05-18T23:40:00	0.02185	-86.46276	-2920.2					3 cores; 28.5 m cored; 3.2 m drilled; 99.7 % recovery
202-1241		Composite Core	COMPCORE		2002-05-20T00:00:00	5.84283	-86.44468	-2026.8					86 cores; 799 m cored; 133.9 m drilled; 101.4 % recovery
202-1241A		Drilling/drill rig	DRILL		2002-05-20T15:45:00	5.84283	-86.44450	-2027.3	2002-05-22T19:20:00				43 cores; 394.4 m cored; 0 m drilled; 102.7 % recovery
202-1241B		Drilling/drill rig	DRILL		2002-05-22T19:20:00	5.84283	-86.44468	-2025.8	2002-05-24T15:10:00				32 cores; 303.6 m cored; 91.4 m drilled; 99.5 % recovery
202-1241C		Drilling/drill rig	DRILL		2002-05-24T15:10:00	5.84283	-86.44486	-2027.2					11 core; 101 m cored; 42.5 m drilled; 102 % recovery
202-1242		Composite Core	COMPCORE		2002-05-26T00:00:00	7.85587	-83.60697	-1363.7					80 cores; 743.8 m cored; 26.5 m drilled; 103.6 % recovery
202-1242A		Drilling/drill rig	DRILL		2002-05-26T02:30:00	7.85586	-83.60670	-1363.4	2002-05-27T04:15:00				27 cores; 250.8 m cored; 0 m drilled; 103.7 % recovery
202-1242B		Drilling/drill rig	DRILL		2002-05-27T04:15:00	7.85588	-83.60688	-1365.2	2002-05-27T23:15:00				27 cores; 250.5 m cored; 5.5 m drilled; 103.5 % recovery
202-1242C		Drilling/drill rig	DRILL		2002-05-27T23:15:00	7.85586	-83.60706	-1363.1	2002-05-28T12:25:00				18 cores; 166.5 m cored; 5.5 m drilled; 102.7 % recovery
202-1242D		Drilling/drill rig	DRILL		2002-05-28T12:25:00	7.85588	-83.60725	-1363.1					8 cores; 76 m cored; 15.5 m drilled; 105.5 % recovery
