Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
20-194		Drilling/drill rig	DRILL		1971-09-19T00:00:00	33.97800	148.81070	-5754					2 cores; 19 m cored; 20.5 m drilled; 78.9 % recovery
20-194_Site		Composite Core	COMPCORE		1971-09-19T00:00:00	33.97800	148.81070	-5754					2 cores; 19 m cored; 20.5 m drilled; 78.9% recovery
20-195		Drilling/drill rig	DRILL		1971-09-22T00:00:00	32.77330	146.97880	-5968					4 cores; 31.5 m cored; 0 m drilled; 44.4 % recovery
20-195A		Drilling/drill rig	DRILL		1971-09-22T00:00:00	32.77330	146.97880	-5968					OPERATIONAL LIMIT REACHED
20-195B		Drilling/drill rig	DRILL		1971-09-22T00:00:00	32.77330	146.97880	-5968					1 cores; 3 m cored; 13.5 m drilled; 50 % recovery
20-195_Site		Composite Core	COMPCORE		1971-09-22T00:00:00	32.77330	146.97880	-5968					5 cores; 34.5 m cored; 13.5 m drilled; 44.9% recovery
20-196_Site		Composite Core	COMPCORE		1971-09-29T00:00:00	30.11620	148.57480	-6194					5 cores; 32 m cored; 8 m drilled; 31.2% recovery
20-196		Drilling/drill rig	DRILL		1971-09-29T00:00:00	30.11620	148.57480	-6194					5 cores; 32 m cored; 8 m drilled; 31.2 % recovery
20-197		Drilling/drill rig	DRILL		1971-10-03T00:00:00	30.29070	147.67430	-6153					1 cores; 8 m cored; 0 m drilled; 12.5 % recovery
20-197_Site		Composite Core	COMPCORE		1971-10-03T00:00:00	30.29070	147.67430	-6153					1 cores; 8 m cored; 0 m drilled; 12.5% recovery
20-198		Drilling/drill rig	DRILL		1971-10-10T00:00:00	25.82570	154.58420	-5848					MECHANICAL OR EQUIP FAILURE
20-198A		Drilling/drill rig	DRILL		1971-10-10T00:00:00	25.82570	154.58420	-5958					4 cores; 34.5 m cored; 16.5 m drilled; 74.5 % recovery
20-198_Site		Composite Core	COMPCORE		1971-10-10T00:00:00	25.82570	154.58420	-5958					4 cores; 34.5 m cored; 16.5 m drilled; 74.5% recovery
20-199_Site		Composite Core	COMPCORE		1971-10-23T00:00:00	13.51300	156.17230	-6100					13 cores; 123.5 m cored; 0 m drilled; 47% recovery
20-199		Drilling/drill rig	DRILL		1971-10-23T00:00:00	13.51300	156.17230	-6100					13 cores; 123.5 m cored; 0 m drilled; 47 % recovery
20-200A		Drilling/drill rig	DRILL		1971-10-26T00:00:00	12.83670	156.78270	-1479					0 cores; 0 m cored; 19 m drilled; % recovery
20-200		Drilling/drill rig	DRILL		1971-10-26T00:00:00	12.83670	156.78270	-1479					9 cores; 85.5 m cored; 9.5 m drilled; 41.4 % recovery
20-200_Site		Composite Core	COMPCORE		1971-10-26T00:00:00	12.83670	156.78270	-1479					9 cores; 85.5 m cored; 28.5 m drilled; 41.4% recovery
20-201		Drilling/drill rig	DRILL		1971-10-27T00:00:00	12.83150	156.74320	-1564					OPERATIONAL LIMIT REACHED
20-202_Site		Composite Core	COMPCORE		1971-10-28T00:00:00	12.81500	156.95250	-1515					3 cores; 28.5 m cored; 28 m drilled; 8.8% recovery
20-202		Drilling/drill rig	DRILL		1971-10-28T00:00:00	12.81500	156.95250	-1515					3 cores; 28.5 m cored; 28 m drilled; 8.8 % recovery