Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
21-203_Site		Composite Core	COMPCORE		1971-11-17T00:00:00	-22.15370	-177.54620	-2720					5 cores; 33.1 m cored; 0 m drilled; 54.4% recovery
21-203		Drilling/drill rig	DRILL		1971-11-17T00:00:00	-22.15370	-177.54620	-2720					5 cores; 33.1 m cored; 0 m drilled; 54.4 % recovery
21-204		Drilling/drill rig	DRILL		1971-11-20T00:00:00	-24.95450	-174.11150	-5354					9 cores; 79 m cored; 0 m drilled; 62.5 % recovery
21-204_Site		Composite Core	COMPCORE		1971-11-20T00:00:00	-24.95450	-174.11150	-5354					10 cores; 88 m cored; 0 m drilled; 61% recovery
21-204A		Drilling/drill rig	DRILL		1971-11-20T00:00:00	-24.95450	-174.11150	-5354					1 cores; 9 m cored; 0 m drilled; 47.8 % recovery
21-205		Drilling/drill rig	DRILL		1971-11-24T00:00:00	-25.51650	177.89920	-4320					24 cores; 216 m cored; 72 m drilled; 62 % recovery
21-205_Site		Composite Core	COMPCORE		1971-11-24T00:00:00	-25.51650	177.89920	-4320					24 cores; 216 m cored; 72 m drilled; 62% recovery
21-206_Site		Composite Core	COMPCORE		1971-11-30T00:00:00	-32.01250	165.45250	-3196					63 cores; 562 m cored; 18 m drilled; 57.8% recovery
21-206		Drilling/drill rig	DRILL		1971-11-30T00:00:00	-32.01250	165.45250	-3196					45 cores; 400 m cored; 0 m drilled; 60.9 % recovery
21-206A		Drilling/drill rig	DRILL		1971-11-30T00:00:00	-32.01250	165.45250	-3196					MECHANICAL OR EQUIP FAILURE
21-206B		Drilling/drill rig	DRILL		1971-11-30T00:00:00	-32.01250	165.45250	-3196					MECHANICAL OR EQUIP FAILURE
21-206C		Drilling/drill rig	DRILL		1971-11-30T00:00:00	-32.01250	165.45250	-3196					18 cores; 162 m cored; 18 m drilled; 50.1 % recovery
21-207A		Drilling/drill rig	DRILL		1971-12-12T00:00:00	-36.96250	165.43430	-1389					45 cores; 405 m cored; 45 m drilled; 52.4 % recovery
21-207		Drilling/drill rig	DRILL		1971-12-12T00:00:00	-36.96250	165.43430	-1389					5 cores; 42 m cored; 0 m drilled; 90.5 % recovery
21-207_Site		Composite Core	COMPCORE		1971-12-12T00:00:00	-36.96250	165.43430	-1389					50 cores; 447 m cored; 45 m drilled; 56% recovery
21-208		Drilling/drill rig	DRILL		1971-12-23T00:00:00	-26.11020	161.22120	-1545					33 cores; 297 m cored; 9 m drilled; 85.9 % recovery
21-208_Site		Composite Core	COMPCORE		1971-12-23T00:00:00	-26.11020	161.22120	-1545					33 cores; 297 m cored; 9 m drilled; 85.9% recovery
21-209		Drilling/drill rig	DRILL		1971-12-28T00:00:00	-15.93650	152.18780	-1428					23 cores; 207 m cored; 85 m drilled; 37.2 % recovery
21-209A		Drilling/drill rig	DRILL		1971-12-28T00:00:00	-15.93650	152.18780	-1428					1 cores; 9 m cored; 0 m drilled; 24.4 % recovery
21-209_Site		Composite Core	COMPCORE		1971-12-28T00:00:00	-15.93650	152.18780	-1428					24 cores; 216 m cored; 85 m drilled; 36.7% recovery
21-210_Site		Composite Core	COMPCORE		1971-12-30T00:00:00	-13.76650	152.89630	-4643					48 cores; 432 m cored; 18 m drilled; 60.6% recovery
21-210		Drilling/drill rig	DRILL		1971-12-30T00:00:00	-13.76650	152.89630	-4643					48 cores; 432 m cored; 18 m drilled; 60.6 % recovery
