Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
23-219A		Drilling/drill rig	DRILL		1972-03-10T00:00:00	9.02920	72.87780	-1764					13 cores; 396 m cored; 9 m drilled; 14.1 % recovery
23-219_Site		Composite Core	COMPCORE		1972-03-10T00:00:00	9.02920	72.87780	-1764					40 cores; 631 m cored; 9 m drilled; 36.2% recovery
23-219		Drilling/drill rig	DRILL		1972-03-10T00:00:00	9.02920	72.87780	-1764					27 cores; 235 m cored; 0 m drilled; 73.5 % recovery
23-220_Site		Composite Core	COMPCORE		1972-03-14T00:00:00	6.51620	70.98370	-4036					20 cores; 168 m cored; 9 m drilled; 60.1% recovery
23-220		Drilling/drill rig	DRILL		1972-03-14T00:00:00	6.51620	70.98370	-4036					20 cores; 168 m cored; 9 m drilled; 60.1 % recovery
23-221_Site		Composite Core	COMPCORE		1972-03-18T00:00:00	7.96970	68.40620	-4650					14 cores; 126 m cored; 44 m drilled; 60.6% recovery
23-221		Drilling/drill rig	DRILL		1972-03-18T00:00:00	7.96970	68.40620	-4650					14 cores; 126 m cored; 44 m drilled; 60.6 % recovery
23-222		Drilling/drill rig	DRILL		1972-03-24T00:00:00	20.09150	61.50930	-3546					33 cores; 286 m cored; 18 m drilled; 59.8 % recovery
23-222_Site		Composite Core	COMPCORE		1972-03-24T00:00:00	20.09150	61.50930	-3546					33 cores; 286 m cored; 18 m drilled; 59.8% recovery
23-223_Site		Composite Core	COMPCORE		1972-03-31T00:00:00	18.74970	60.12970	-3633					39 cores; 351 m cored; 0 m drilled; 55.4% recovery
23-223		Drilling/drill rig	DRILL		1972-03-31T00:00:00	18.74970	60.12970	-3633					39 cores; 351 m cored; 0 m drilled; 55.4 % recovery
23-224		Drilling/drill rig	DRILL		1972-04-05T00:00:00	16.54180	59.70170	-2500					9 cores; 81 m cored; 18 m drilled; 38.1 % recovery
23-224_Site		Composite Core	COMPCORE		1972-04-05T00:00:00	16.54180	59.70170	-2500					9 cores; 81 m cored; 18 m drilled; 38.1% recovery
23-225_Site		Composite Core	COMPCORE		1972-04-15T00:00:00	21.30970	38.25180	-1228					27 cores; 221 m cored; 9 m drilled; 62.2% recovery
23-225		Drilling/drill rig	DRILL		1972-04-15T00:00:00	21.30970	38.25180	-1228					27 cores; 221 m cored; 9 m drilled; 62.2 % recovery
23-226_Site		Composite Core	COMPCORE		1972-04-17T00:00:00	21.34180	38.08220	-2169					2 cores; 14 m cored; 0 m drilled; 63.6% recovery
23-226		Drilling/drill rig	DRILL		1972-04-17T00:00:00	21.34180	38.08220	-2169					2 cores; 14 m cored; 0 m drilled; 63.6 % recovery
23-226A		Drilling/drill rig	DRILL		1972-04-17T00:00:00	21.34180	38.08220	-2169					OPERATIONAL LIMIT REACHED
23-226B		Drilling/drill rig	DRILL		1972-04-17T00:00:00	21.34180	38.08220	-2169					OPERATIONAL LIMIT REACHED
23-226C		Drilling/drill rig	DRILL		1972-04-17T00:00:00	21.34180	38.08220	-2169					OPERATIONAL LIMIT REACHED
23-227		Drilling/drill rig	DRILL		1972-04-18T00:00:00	21.33100	38.13280	-1795					42 cores; 344 m cored; 0 m drilled; 35.9 % recovery
23-227_Site		Composite Core	COMPCORE		1972-04-18T00:00:00	21.33100	38.13280	-1795					42 cores; 344 m cored; 0 m drilled; 35.9% recovery
23-228_Site		Composite Core	COMPCORE		1972-04-22T00:00:00	19.08600	39.00330	-1038					38 cores; 306 m cored; 9 m drilled; 59.9% recovery
23-228		Drilling/drill rig	DRILL		1972-04-22T00:00:00	19.08600	39.00330	-1038					38 cores; 306 m cored; 9 m drilled; 59.9 % recovery
23-229		Drilling/drill rig	DRILL		1972-04-27T00:00:00	14.76820	42.19120	-852					4 cores; 33 m cored; 0 m drilled; 88 % recovery
23-229A		Drilling/drill rig	DRILL		1972-04-27T00:00:00	14.76820	42.19120	-852					17 cores; 153 m cored; 9 m drilled; 77.6 % recovery
23-229_Site		Composite Core	COMPCORE		1972-04-27T00:00:00	14.76820	42.19120	-852					21 cores; 186 m cored; 9 m drilled; 79.4% recovery
23-230_Site		Composite Core	COMPCORE		1972-04-28T00:00:00	15.31670	41.83420	-832					1 cores; 9 m cored; 0 m drilled; 46.7% recovery
23-230		Drilling/drill rig	DRILL		1972-04-28T00:00:00	15.31670	41.83420	-832					1 cores; 9 m cored; 0 m drilled; 46.7 % recovery
