Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
60-452_Site		Composite Core	COMPCORE		1978-03-23T00:00:00	17.66965	148.62900	-5859					9 cores; 86.5 m cored; 0 m drilled; 68.4% recovery
60-452A		Drilling/drill rig	DRILL		1978-03-23T00:00:00	17.66950	148.62920	-5860					5 cores; 46.5 m cored; 0 m drilled; 46.8 % recovery
60-452		Drilling/drill rig	DRILL		1978-03-23T00:00:00	17.66980	148.62880	-5858					4 cores; 40 m cored; 0 m drilled; 93.6 % recovery
60-453_Site		Composite Core	COMPCORE		1978-03-28T00:00:00	17.90700	143.68250	-4693					63 cores; 595.5 m cored; 9.5 m drilled; 39.5% recovery
60-453		Drilling/drill rig	DRILL		1978-03-28T00:00:00	17.90700	143.68250	-4693					63 cores; 595.5 m cored; 9.5 m drilled; 39.5 % recovery
60-454		Drilling/drill rig	DRILL		1978-04-05T00:00:00	18.01300	144.53200	-3816					4 cores; 29 m cored; 9.5 m drilled; 77.6 % recovery
60-454_Site		Composite Core	COMPCORE		1978-04-05T00:00:00	18.01300	144.53200	-3816					20 cores; 171.5 m cored; 19 m drilled; 37% recovery
60-454A		Drilling/drill rig	DRILL		1978-04-05T00:00:00	18.01300	144.53200	-3816					16 cores; 142.5 m cored; 9.5 m drilled; 28.8 % recovery
60-455		Drilling/drill rig	DRILL		1978-04-10T00:00:00	17.85430	145.35800	-3465					11 cores; 104 m cored; 0 m drilled; 30.1 % recovery
60-455_Site		Composite Core	COMPCORE		1978-04-10T00:00:00	17.85430	145.35800	-3465					11 cores; 104 m cored; 0 m drilled; 30.1% recovery
60-456_Site		Composite Core	COMPCORE		1978-04-12T00:00:00	17.91155	145.18040	-3586					33 cores; 299 m cored; 9.5 m drilled; 23.4% recovery
60-456		Drilling/drill rig	DRILL		1978-04-12T00:00:00	17.91130	145.17950	-3586					18 cores; 159.5 m cored; 9.5 m drilled; 20.3 % recovery
60-456A		Drilling/drill rig	DRILL		1978-04-12T00:00:00	17.91180	145.18130	-3586					15 cores; 139.5 m cored; 0 m drilled; 26.9 % recovery
60-457		Drilling/drill rig	DRILL		1978-04-16T00:00:00	17.83320	145.81700	-2630					4 cores; 37.2 m cored; 4 m drilled; 49.3 % recovery
60-457_Site		Composite Core	COMPCORE		1978-04-16T00:00:00	17.83320	145.81700	-2630					4 cores; 37.2 m cored; 4 m drilled; 49.3% recovery
60-458_Site		Composite Core	COMPCORE		1978-04-18T00:00:00	17.86420	146.93430	-3447					46 cores; 437 m cored; 28.5 m drilled; 22.3% recovery
60-458		Drilling/drill rig	DRILL		1978-04-18T00:00:00	17.86420	146.93430	-3447					46 cores; 437 m cored; 28.5 m drilled; 22.3 % recovery
60-459		Drilling/drill rig	DRILL		1978-04-25T00:00:00	17.86250	147.30150	-4121					2 cores; 15.5 m cored; 0 m drilled; 52.8 % recovery
60-459A		Drilling/drill rig	DRILL		1978-04-25T00:00:00	17.86250	147.30150	-4121					MECHANICAL OR EQUIP FAILURE
60-459_Site		Composite Core	COMPCORE		1978-04-25T00:00:00	17.86250	147.30150	-4121					70 cores; 659.5 m cored; 28.5 m drilled; 28% recovery
60-459B		Drilling/drill rig	DRILL		1978-04-25T00:00:00	17.86250	147.30150	-4121					68 cores; 644 m cored; 28.5 m drilled; 27.4 % recovery
60-460		Drilling/drill rig	DRILL		1978-05-04T00:00:00	17.66900	147.59870	-6452					10 cores; 84.5 m cored; 9.5 m drilled; 50.7 % recovery
60-460A		Drilling/drill rig	DRILL		1978-05-04T00:00:00	17.66700	147.58600	-6445					12 cores; 99.6 m cored; 0 m drilled; 37.3 % recovery
60-460_Site		Composite Core	COMPCORE		1978-05-04T00:00:00	17.66800	147.59235	-6448.5					22 cores; 184.1 m cored; 9.5 m drilled; 43.5% recovery
60-461		Drilling/drill rig	DRILL		1978-05-09T00:00:00	17.76750	147.68630	-7034					3 cores; 20.5 m cored; 0 m drilled; 41.8 % recovery
60-461_Site		Composite Core	COMPCORE		1978-05-09T00:00:00	17.76725	147.68700	-7034					5 cores; 36 m cored; 0 m drilled; 44% recovery
60-461A		Drilling/drill rig	DRILL		1978-05-09T00:00:00	17.76700	147.68770	-7034					2 cores; 15.5 m cored; 0 m drilled; 46.8 % recovery
