Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
65-482B		Drilling/drill rig	DRILL		1979-01-24T00:00:00	22.78970	-107.99330	-2998					24 cores; 184.5 m cored; 0 m drilled; 54.1 % recovery
65-482		Drilling/drill rig	DRILL		1979-01-24T00:00:00	22.78970	-107.99380	-2998					1 cores; 4 m cored; 0 m drilled; 98.5 % recovery
65-482C		Drilling/drill rig	DRILL		1979-01-24T00:00:00	22.78900	-107.99280	-2998					15 cores; 120.5 m cored; 0 m drilled; 70.2 % recovery
65-482_Site		Composite Core	COMPCORE		1979-01-24T00:00:00	22.78932	-107.99308	-2999.7					60 cores; 483 m cored; 7.5 m drilled; 59.5% recovery
65-482D		Drilling/drill rig	DRILL		1979-01-24T00:00:00	22.78850	-107.99180	-3008					13 cores; 114 m cored; 0 m drilled; 56.3 % recovery
65-482E		Drilling/drill rig	DRILL		1979-01-24T00:00:00	22.78950	-107.99270	-2998					MECHANICAL OR EQUIP FAILURE
65-482F		Drilling/drill rig	DRILL		1979-01-24T00:00:00	22.78930	-107.99350	-2998					4 cores; 31.5 m cored; 7.5 m drilled; 51 % recovery
65-482A		Drilling/drill rig	DRILL		1979-01-24T00:00:00	22.78970	-107.99330	-2998					3 cores; 28.5 m cored; 0 m drilled; 65.7 % recovery
65-483B		Drilling/drill rig	DRILL		1979-02-12T00:00:00	22.88320	-108.74730	-3070					28 cores; 160.5 m cored; 28.5 m drilled; 57.2 % recovery
65-483		Drilling/drill rig	DRILL		1979-02-12T00:00:00	22.88330	-108.74830	-3070					26 cores; 204.5 m cored; 0 m drilled; 54.1 % recovery
65-483A		Drilling/drill rig	DRILL		1979-02-12T00:00:00	22.88320	-108.74730	-3070					OBJECTIVE REACHED
65-483C		Drilling/drill rig	DRILL		1979-02-12T00:00:00	22.88300	-108.74300	-3070					4 cores; 37.5 m cored; 0 m drilled; 69.8 % recovery
65-483_Site		Composite Core	COMPCORE		1979-02-12T00:00:00	22.88317	-108.74620	-3070					58 cores; 402.5 m cored; 28.5 m drilled; 56.8% recovery
65-484		Drilling/drill rig	DRILL		1979-03-03T00:00:00	23.18870	-108.39330	-2891					1 cores; 5 m cored; 0 m drilled; 100 % recovery
65-484_Site		Composite Core	COMPCORE		1979-03-03T00:00:00	23.18725	-108.39350	-2887					8 cores; 66 m cored; 0 m drilled; 69.8% recovery
65-484A		Drilling/drill rig	DRILL		1979-03-03T00:00:00	23.18580	-108.39370	-2883					7 cores; 61 m cored; 0 m drilled; 67.3 % recovery
65-485		Drilling/drill rig	DRILL		1979-03-05T00:00:00	22.74920	-107.90350	-2981					6 cores; 50.5 m cored; 0 m drilled; 73.1 % recovery
65-485A		Drilling/drill rig	DRILL		1979-03-05T00:00:00	22.74870	-107.90380	-2981					38 cores; 271 m cored; 9.5 m drilled; 50.2 % recovery
65-485_Site		Composite Core	COMPCORE		1979-03-05T00:00:00	22.74895	-107.90365	-2981					44 cores; 321.5 m cored; 9.5 m drilled; 53.8% recovery
