Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
80-548		Drilling/drill rig	DRILL		1981-06-10T00:00:00	48.91580	-12.16400	-1251					35 cores; 211 m cored; 0 m drilled; 99.6 % recovery
80-548_Site		Composite Core	COMPCORE		1981-06-10T00:00:00	48.91565	-12.16425	-1251					72 cores; 545.2 m cored; 9.5 m drilled; 84.2% recovery
80-548A		Drilling/drill rig	DRILL		1981-06-10T00:00:00	48.91550	-12.16450	-1251					37 cores; 334.2 m cored; 9.5 m drilled; 74.4 % recovery
80-549_Site		Composite Core	COMPCORE		1981-06-15T00:00:00	49.08810	-13.09810	-2514					130 cores; 956.5 m cored; 56.5 m drilled; 53.7% recovery
80-549A		Drilling/drill rig	DRILL		1981-06-15T00:00:00	49.08820	-13.09820	-2513					39 cores; 197 m cored; 3.5 m drilled; 72.9 % recovery
80-549		Drilling/drill rig	DRILL		1981-06-15T00:00:00	49.08800	-13.09800	-2515					91 cores; 759.5 m cored; 53 m drilled; 48.7 % recovery
80-550B		Drilling/drill rig	DRILL		1981-06-30T00:00:00	48.51600	-13.43870	-4420					30 cores; 264.5 m cored; 133 m drilled; 67.2 % recovery
80-550		Drilling/drill rig	DRILL		1981-06-30T00:00:00	48.51520	-13.43950	-4420					43 cores; 400 m cored; 23.5 m drilled; 63.1 % recovery
80-550A		Drilling/drill rig	DRILL		1981-06-30T00:00:00	48.51520	-13.43950	-4420					OPERATIONAL LIMIT REACHED
80-550_Site		Composite Core	COMPCORE		1981-06-30T00:00:00	48.51560	-13.43910	-4420					73 cores; 664.5 m cored; 156.5 m drilled; 64.8% recovery
80-551_Site		Composite Core	COMPCORE		1981-07-16T00:00:00	48.91070	-13.50150	-3887					13 cores; 98.5 m cored; 7 m drilled; 68.2% recovery
80-551		Drilling/drill rig	DRILL		1981-07-16T00:00:00	48.91070	-13.50150	-3887					13 cores; 98.5 m cored; 7 m drilled; 68.2 % recovery