Event label	Optional label	Method/Device	Abbreviation	O2A Registry URI	Date/Time	Latitude	Longitude	Elevation	Date/Time end	Latitude end	Longitude end	Elevation end	Comment
8-68_Site		Composite Core	COMPCORE		1969-10-10T00:00:00	16.72200	-164.17270	-5466					2 cores; 15 m cored; 9 m drilled; 99.3% recovery
8-68A		Drilling/drill rig	DRILL		1969-10-10T00:00:00	16.72200	-164.17270	-5466					0 cores; 0 m cored; 9 m drilled; % recovery
8-68		Drilling/drill rig	DRILL		1969-10-10T00:00:00	16.72200	-164.17270	-5466					2 cores; 15 m cored; 0 m drilled; 99.3 % recovery
8-69_Site		Composite Core	COMPCORE		1969-10-17T00:00:00	6.00000	-152.86550	-4978					19 cores; 155 m cored; 0 m drilled; 88.8% recovery
8-69		Drilling/drill rig	DRILL		1969-10-17T00:00:00	6.00000	-152.86550	-4978					7 cores; 49 m cored; 0 m drilled; 92.9 % recovery
8-69A		Drilling/drill rig	DRILL		1969-10-17T00:00:00	6.00000	-152.86550	-4978					12 cores; 106 m cored; 0 m drilled; 87 % recovery
8-70_Site		Composite Core	COMPCORE		1969-10-23T00:00:00	6.33470	-140.36200	-5059					46 cores; 331 m cored; 0 m drilled; 75% recovery
8-70A		Drilling/drill rig	DRILL		1969-10-23T00:00:00	6.33470	-140.36200	-5059					30 cores; 218 m cored; 0 m drilled; 67.2 % recovery
8-70		Drilling/drill rig	DRILL		1969-10-23T00:00:00	6.33470	-140.36200	-5059					12 cores; 108 m cored; 0 m drilled; 90.7 % recovery
8-70B		Drilling/drill rig	DRILL		1969-10-23T00:00:00	6.33470	-140.36200	-5059					4 cores; 5 m cored; 0 m drilled; 76 % recovery
8-71_Site		Composite Core	COMPCORE		1969-11-01T00:00:00	4.47130	-140.31520	-4419					52 cores; 444.5 m cored; 0 m drilled; 84.1% recovery
8-71		Drilling/drill rig	DRILL		1969-11-01T00:00:00	4.47130	-140.31520	-4419					49 cores; 431 m cored; 0 m drilled; 85.4 % recovery
8-71A		Drilling/drill rig	DRILL		1969-11-01T00:00:00	4.47130	-140.31520	-4419					3 cores; 13.5 m cored; 0 m drilled; 40.7 % recovery
8-72A		Drilling/drill rig	DRILL		1969-11-12T00:00:00	0.44150	-138.86700	-4326					6 cores; 54 m cored; 0 m drilled; 87 % recovery
8-72_Site		Composite Core	COMPCORE		1969-11-12T00:00:00	0.44150	-138.86700	-4326					17 cores; 141 m cored; 0 m drilled; 93.5% recovery
8-72		Drilling/drill rig	DRILL		1969-11-12T00:00:00	0.44150	-138.86700	-4326					11 cores; 87 m cored; 0 m drilled; 97.5 % recovery
8-73_Site		Composite Core	COMPCORE		1969-11-17T00:00:00	-1.90970	-137.46870	-4387					21 cores; 172.5 m cored; 0 m drilled; 97.3% recovery
8-73		Drilling/drill rig	DRILL		1969-11-17T00:00:00	-1.90970	-137.46870	-4387					21 cores; 172.5 m cored; 0 m drilled; 97.3 % recovery
8-74_Site		Composite Core	COMPCORE		1969-11-21T00:00:00	-6.23670	-136.09670	-4431					11 cores; 92 m cored; 0 m drilled; 71.4% recovery
8-74		Drilling/drill rig	DRILL		1969-11-21T00:00:00	-6.23670	-136.09670	-4431					11 cores; 92 m cored; 0 m drilled; 71.4 % recovery
8-75A		Drilling/drill rig	DRILL		1969-11-24T00:00:00	-12.51670	-134.26670	-4181					OPERATIONAL LIMIT REACHED
8-75		Drilling/drill rig	DRILL		1969-11-24T00:00:00	-12.51670	-134.26670	-4181					10 cores; 81.1 m cored; 0 m drilled; 84.3 % recovery
8-75_Site		Composite Core	COMPCORE		1969-11-24T00:00:00	-12.51670	-134.26670	-4181					10 cores; 81.1 m cored; 0 m drilled; 84.3% recovery
