Not logged in
PANGAEA.
Data Publisher for Earth & Environmental Science

Event List of Leg6

Download as tab-delimited text

Event labelOptional labelMethod/DeviceAbbreviationSensor URIDate/TimeLatitudeLongitudeElevationDate/Time endLatitude endLongitude endElevation endComment
6-44Drilling/drill rigDRILL1969-06-13T00:00:0019.30830-169.01500-14785 cores; 32.4 m cored; 0 m drilled; 89.5 % recovery
6-44_SiteComposite CoreCOMPCORE1969-06-13T00:00:0019.30830-169.01500-14785 cores; 32.4 m cored; 0 m drilled; 89.5% recovery
6-45Drilling/drill rigDRILL1969-06-17T00:00:0024.26500-178.50830-5508MECHANICAL OR EQUIP FAILURE
6-45ADrilling/drill rigDRILL1969-06-17T00:00:0024.26500-178.50830-55083 cores; 26.5 m cored; 9.1 m drilled; 21.9 % recovery
6-45_SiteComposite CoreCOMPCORE1969-06-17T00:00:0024.26500-178.50830-55083 cores; 26.5 m cored; 9.1 m drilled; 21.9% recovery
6-46_SiteComposite CoreCOMPCORE1969-06-24T00:00:0027.88330171.43830-57691 cores; 9.1 m cored; 0 m drilled; 98.9% recovery
6-46Drilling/drill rigDRILL1969-06-24T00:00:0027.88330171.43830-57691 cores; 9.1 m cored; 0 m drilled; 98.9 % recovery
6-47_SiteComposite CoreCOMPCORE1969-06-28T00:00:0032.44830157.71170-268916 cores; 138.4 m cored; 1.2 m drilled; 81.3% recovery
6-47ADrilling/drill rigDRILL1969-06-28T00:00:0032.44830157.71170-26891 cores; 9.2 m cored; 1.2 m drilled; 26.1 % recovery
6-47BDrilling/drill rigDRILL1969-06-28T00:00:0032.44830157.71170-268914 cores; 120.1 m cored; 0 m drilled; 84.2 % recovery
6-47Drilling/drill rigDRILL1969-06-28T00:00:0032.44830157.71170-26891 cores; 9.1 m cored; 0 m drilled; 100 % recovery
6-48Drilling/drill rigDRILL1969-06-30T00:00:0032.40830158.02170-2619OPERATIONAL LIMIT REACHED
6-48ADrilling/drill rigDRILL1969-06-30T00:00:0032.40830158.02170-26191 cores; 0.6 m cored; 0 m drilled; 100 % recovery
6-48BDrilling/drill rigDRILL1969-06-30T00:00:0032.40830158.02170-26193 cores; 21 m cored; 0 m drilled; 98.6 % recovery
6-48_SiteComposite CoreCOMPCORE1969-06-30T00:00:0032.40830158.02170-26194 cores; 21.6 m cored; 0 m drilled; 98.6% recovery
6-49ADrilling/drill rigDRILL1969-07-02T00:00:0032.40170156.60000-42822 cores; 14.6 m cored; 0 m drilled; 68.5 % recovery
6-49Drilling/drill rigDRILL1969-07-02T00:00:0032.40170156.60000-42822 cores; 9.7 m cored; 0 m drilled; 100 % recovery
6-49_SiteComposite CoreCOMPCORE1969-07-02T00:00:0032.40170156.60000-42824 cores; 24.3 m cored; 0 m drilled; 81.1% recovery
6-50Drilling/drill rigDRILL1969-07-03T00:00:0032.40330156.57170-44872 cores; 6.7 m cored; 0 m drilled; 194 % recovery
6-50_SiteComposite CoreCOMPCORE1969-07-03T00:00:0032.40330156.57170-44876 cores; 37.5 m cored; 0 m drilled; 103.2% recovery
6-50ADrilling/drill rigDRILL1969-07-03T00:00:0032.40330156.57170-44874 cores; 30.8 m cored; 0 m drilled; 83.4 % recovery
6-51ADrilling/drill rigDRILL1969-07-04T00:00:0033.47500153.40500-59812 cores; 15.2 m cored; 0 m drilled; 71.1 % recovery
6-51_SiteComposite CoreCOMPCORE1969-07-04T00:00:0033.47500153.40500-59814 cores; 32.6 m cored; 0 m drilled; 61.7% recovery
6-51Drilling/drill rigDRILL1969-07-04T00:00:0033.47500153.40500-59812 cores; 17.4 m cored; 0 m drilled; 53.4 % recovery
6-52Drilling/drill rigDRILL1969-07-09T00:00:0027.77170147.13000-574410 cores; 68.9 m cored; 0 m drilled; 65.2 % recovery
6-52_SiteComposite CoreCOMPCORE1969-07-09T00:00:0027.77170147.13000-574410 cores; 68.9 m cored; 0 m drilled; 65.2% recovery
6-53BDrilling/drill rigDRILL1969-07-13T00:00:0018.03330141.19170-46291 cores; 9.1 m cored; 0 m drilled; 98.9 % recovery
6-53ADrilling/drill rigDRILL1969-07-13T00:00:0018.03330141.19170-46293 cores; 27.5 m cored; 0 m drilled; 92.1 % recovery
6-53Drilling/drill rigDRILL1969-07-13T00:00:0018.03330141.19170-46299 cores; 53.9 m cored; 0 m drilled; 22.6 % recovery
6-53_SiteComposite CoreCOMPCORE1969-07-13T00:00:0018.03330141.19170-462913 cores; 90.5 m cored; 0 m drilled; 51.4% recovery
6-54_SiteComposite CoreCOMPCORE1969-07-17T00:00:0015.61000140.30170-49909 cores; 65.5 m cored; 0 m drilled; 41.4% recovery
6-54Drilling/drill rigDRILL1969-07-17T00:00:0015.61000140.30170-49909 cores; 65.5 m cored; 0 m drilled; 41.4 % recovery
6-55_SiteComposite CoreCOMPCORE1969-07-21T00:00:009.30170142.53500-285014 cores; 128.1 m cored; 0 m drilled; 93% recovery
6-55Drilling/drill rigDRILL1969-07-21T00:00:009.30170142.53500-285014 cores; 128.1 m cored; 0 m drilled; 93 % recovery
6-56BDrilling/drill rigDRILL1969-07-23T00:00:008.37330143.56000-250810 cores; 119.7 m cored; 0 m drilled; 68.1 % recovery
6-56_SiteComposite CoreCOMPCORE1969-07-23T00:00:008.37330143.56000-250810 cores; 119.7 m cored; 0 m drilled; 68.1% recovery
6-56Drilling/drill rigDRILL1969-07-23T00:00:008.37330143.56000-2508MECHANICAL OR EQUIP FAILURE
6-56ADrilling/drill rigDRILL1969-07-23T00:00:008.37330143.56000-2508MECHANICAL OR EQUIP FAILURE
6-57ADrilling/drill rigDRILL1969-07-25T00:00:008.68170143.53330-33004 cores; 31.4 m cored; 0 m drilled; 72 % recovery
6-57BDrilling/drill rigDRILL1969-07-25T00:00:008.68170143.53330-33001 cores; 9.2 m cored; 0 m drilled; 97.8 % recovery
6-57_SiteComposite CoreCOMPCORE1969-07-25T00:00:008.68170143.53330-330010 cores; 376 m cored; 0 m drilled; 10.1% recovery
6-57Drilling/drill rigDRILL1969-07-25T00:00:008.68170143.53330-33005 cores; 335.4 m cored; 0 m drilled; 1.9 % recovery
6-58Drilling/drill rigDRILL1969-07-28T00:00:009.23500144.41830-45031 cores; 0.1 m cored; 0 m drilled; 210 % recovery
6-58ADrilling/drill rigDRILL1969-07-28T00:00:009.23500144.41830-45031 cores; 9.1 m cored; 1.2 m drilled; 49.5 % recovery
6-58BDrilling/drill rigDRILL1969-07-28T00:00:009.23500144.41830-44861 cores; 6.7 m cored; 0 m drilled; 134.3 % recovery
6-58_SiteComposite CoreCOMPCORE1969-07-28T00:00:009.23500144.41830-4497.33 cores; 15.9 m cored; 1.2 m drilled; 86.2% recovery
6-59ADrilling/drill rigDRILL1969-07-31T00:00:0011.78000147.58170-55541 cores; 9.2 m cored; 18.3 m drilled; 32.6 % recovery
6-59BDrilling/drill rigDRILL1969-07-31T00:00:0011.78000147.58170-55476 cores; 46 m cored; 0 m drilled; 39.6 % recovery
6-59Drilling/drill rigDRILL1969-07-31T00:00:0011.78000147.58170-55540 cores; 0 m cored; 0.6 m drilled; % recovery
6-59_SiteComposite CoreCOMPCORE1969-07-31T00:00:0011.78000147.58170-5551.77 cores; 55.2 m cored; 18.9 m drilled; 38.4% recovery
6-60_SiteComposite CoreCOMPCORE1969-08-03T00:00:0013.66670145.69830-37179 cores; 63 m cored; 0 m drilled; 53.2% recovery
6-60Drilling/drill rigDRILL1969-08-03T00:00:0013.66670145.69830-37179 cores; 63 m cored; 0 m drilled; 53.2 % recovery